Master Project List (subject to change, ha ha)

This is a broad outline of what’s being done.

  • Order stuff
    • Kitchen cabinets (completed)
    • Countertops (completed)
    • Plumbing (completed)
    • Electric (mostly completed)
    • Flooring (pending framing inspection)
    • Misc parts and tools (ongoing)
  • Demo
    • Pack up and move stuff out of kitchen, dining and living (completed)
    • Demo walls, ceilings (partial) and floors (completed)
    • Demo floor in mudroom
    • Move upstairs bath plumbing (temporarily re-routed)
  • Build
    • Encapsulate attic (previously completed)
    • New framing in attic (part 1)
    • New framing in attic (part 2)
    • Move Network, Telephone, and CATV (completed)
    • Radon remediation in crawlspace (previously completed)
    • Encapsulate crawlspace (previously completed)
    • Spray foam in mudroom and garage (previously completed – need pics)
    • Dig holes in crawlspace (completed)
    • Call for inspection (completed – passed)
    • Pour concrete piers (completed)
    • Reinforce floor joists that are above new piers (completed)
    • Move refrigerant lines in attic (completed)
    • Build out network space in attic (completed)
    • Move network, phone, and TV (completed)
    • Install permanent support jacks (completed – need pics)
    • Build out temporary supports (completed)
    • Build out new framing (completed)
    • Call for framing inspection (completed.  Yay, I passed!)
    • Remove temporary walls (completed)
    • Finish build out in mudroom
    • Tile in Utility
    • Rough Plumbing
      • Install modified trunk and branch loop in crawlspace
      • Rough in plumbing for master bath and upstairs master bath (area 1 and 2)
      • Rough in plumbing for down stairs powder room (area 3)
      • Rough in plumbing for upstairs laundry, hall bath (area 4)
      • Rough in plumbing for coffee bar, refrigerators, and RO system (area 5)
      • Rough in plumbing for rest of kitchen and utility room (area 6)
      • Rough in new 3in drain for utility closet
      • Move H2O heater and H2O treatment
      • Install hot H2O recirculation pump
      • Rough in RO system
    • Rough Electrical
      • Move existing MIL suite ckts to sub-panel in MIL suite
      • Run new circuits for lights, receps and floor heating
      • Install cans and other lights
      • Replace panels
    • Network, etc…
      • rough in network, phone and cable locations
      • rough in home theatre stuff
    • Walls
      • Hang drywall – main house and mudroom
      • Finish drywall
      • Paint
    • Flooring
      • Install floor heaters – main house and mudroom
      • Install floors
    • Install cabinets
    • Call for counter top templating
    • Finish electrical and Network, etc…
    • Install counter tops
    • Install sinks
    • Finish plumbing
    • Finish RO system
    • Install appliances
    • Misc. items to be installed
    • Start moving stuff back into the new kitchen
    • Install crown and base boards and associated lighting