Attic Framing (pt. 2)

Started:  Finished:

Objectives:

  • Cover duct work
  • Wall off dead space
  • Provide space for network gear
  • Provide cooling and power for network equipment

Most of this work was done so I could move the network.  I’m still far from finished with the attic, but have more pressing issues. Of course this project began with some demolition work.  The floors needed to come up so I could have access to the walls below for running cable.  The area where the network equipment went looked like this before:

Prior to spraying. This is what the network area looked like before any work.

And this is what it looks like after:

Similar angle to the before pic. Nothing fancy, but it’s an attic.